EJtech

RESULT

MEASURMENT AND SHM

HOME > RESULT > MEASURMENT AND SHM

 

번호 현장명 발주처 작업연도
339 Tunnel | Donghae Line, Pohang~Samcheok railway construction, Line 9, Instrumentation and monitoring Daewoo E&C 2015.09
338 Tunnel | Hanam Line (Line 5 extension)Section 1-2 construction, Instrumentation and monitoring Ssangyong E&C 2015.09
337 Slope | Icheon, Military base construction, Automated slope instrumentation and monitoring IlKwang E&C 2015.08
336 Excavation | Korean National Police University relocation project, Seismic acceleration instrumentation and monitoring system establi… Daelim Ind. 2015.07
335 Tunnel | Happy city access road, Section 2, Instrumentation and monitoring hyundai notice 2015.06
334 LNG Tank | Radioactive waste disposal facility, Structural performance monitorinng KORAD 2015.05
333 Tunnel | Expressway construction, Line 14, Milyang-Ulsan (Section 3), Tunnel instrumentation and monitoring (Section 2) Daebo Cons. 2015.05
332 Bridges | Hangang (Han river) Online safety monitoring system maintenance for 2015 Seoul Metropolitan Government 2015.04
331 Dam | Chungju Dam, Flood control ability improvement project, Instrumentation and monitoring Daelim Ind. 2015.04
330 Bridges | Incheon Grand Bridge instrumentation and monitoring data analysis for 2015 Incheon Bridge Co. Ltd. 2015.03
 1  2  3  4  5  6  7  8  9  10    

 

TOP